Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Feb 01, 2023     Empennage fairing trimming - (3 hours)       Category: Tail Feathers
Removed, trimmed and sanded the edges of the empennage fairing. The fit with the tail is way better than before. Decided to fill some of the mounting holes as I don't think they are needed now that the fairing fits better. The fairing still needs some work, but it's getting there. Installed the left elevator to be able to cut the elevator trim wire to length and used the remainder for the aileron trim. Used my new pin tools from Avery to temporarily install the elevator. Worked great. Ran that wire in the fuse.


 